This was a post from the old forum when Nesco was trying to release the Multi-Fuel kit. It makes me giggle.
"I just talked to NESCO. UL only has one test left to do, A rain test. Every thing has passed up to this point. I under stand the factory is ready to start production when they get approval. They are simple to build so they should be able to get up and ruining with no problems. Time to go vote for the next president of the USA."
_________________
dealer for Amaizablaze 7100 4100 2100 factory trained repair man
disclaimer: No insult intended to original poster. Only laughing at double meaning created by a typo [ruining vs running].